Have the cylinder head automatically delivered to assemble the roller locker. Test the image of the head top and test if the stem end cap is not missing.
Assembly quantity | 16 points |
---|---|
Cycle time | 54 seconds (including 10 seconds for carrying in and out) |
Carrying height | 860mm |
Equipment size | Depth 3000mm×width 1260mm×height 1660mm (Entire length of the transporting part: 1000mm) |
Primary air | 0.3MPa 3/8 |
Primary power supply | 200V 7.9KVA |
Tohoku Area: Shinmei Tohoku Machinery Co., Ltd. China: Tianjin Xinming Auto Parts Co., Ltd.
Have the cylinder head automatically delivered with the pallet to assemble the stem end cap. Put in the rush adjuster from behind the equipment to be assembled.
Assembly quantity | 16 locations each, 32 locations in total |
---|---|
Cycle time | 54 seconds (including 10 seconds for carrying in and out) |
Carrying height | 860mm |
Equipment size | Depth 3400mm×width 1500mm×height 1800mm |
Primary air | 0.3MPa 3/8 |
Primary power supply | 200V 11.8KVA |
Tohoku Area: Shinmei Tohoku Machinery Co., Ltd. China: Tianjin Xinming Auto Parts Co., Ltd.